Theater having a modular auditorium and method for assembling a theater

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11846116
APP PUB NO 20230003041A1
SERIAL NO

17940463

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for assembling a theater and a theater. The method includes assembling a modular auditorium on a surface within a building structure by providing a plurality of nominal inventory portions. Each nominal inventory portions includes a prefabricated base portion, and a prefabricated tier section for assembly to the base portion. The prefabricated base portion is positioned on a ground surface of a public performance space. The prefabricated tier section is fastened to the prefabricated base portion to form a self supporting structure that does not require lateral support from a building structure other than the ground surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIT TOWERS MANUFACTURING LLC401 W LINCOLN AVENUE LITITZ PA 17543

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ager, Mark London, GB 5 5
Richardson, Ewart London, GB 7 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00