Grain production with field conditioned pollen

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11844347
SERIAL NO

17458944

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described are methods of grain production with field conditioned pollen. A method of the present invention includes growing one or more designated female plants that include both female and male components, collecting fresh pollen from designated male plants from a different genetic background, and subjecting the fresh pollen to field conditions, which may regulate pollen moisture content. The field conditioning conditions may include a relative humidity ranging from about 50% to about 100%, a temperature ranging from about −10-10° C., and an air pressure ranging from about 15 kPa to about 150 kPa. These conditions may result in pollen having a moisture content of about 40% to about 58%. The one or more designated female plants are intentionally cross-pollinated with the field conditioned pollen and then grown to maturity such that the grain may be harvested therefrom. Also provided is a method of preventing undesirable pollination in grain production.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACCELERATED AG TECHNOLOGIES LLC2302 SE CREEKVIEW DRIVE SUITE 6 ANKENY IA 50021

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cope, Jason Ankeny, US 58 485
Etter, Sara Katherine Bondurant, US 8 10
Krone, Todd Des Moines, US 23 25
Singletary, George Ankeny, US 20 147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00