Blocker door assembly having a thermoplastic blocker door for use in a turbine engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11840986
APP PUB NO 20200291892A1
SERIAL NO

16857487

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A blocker door assembly for use in a gas turbine includes a panel, a core integrally formed with the panel, and a plurality of mounting structures extending from at least one of the panel and the core. The plurality of mounting structures are integrally formed with the core and the panel such that the panel, the core, and the mounting structures are co-molded from a thermoplastic material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY100 N RIVERSIDE CHICAGO IL 60606-1596

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barene, David John Arlington, US 3 15
Foutch, David W Seattle, US 25 500
Gaw, Kevin O'Brien Seattle, US 15 59
Grove, Randy J Tukwila, US 8 21
Jones, Dylan E Seattle, US 2 7
Larson, Michael H Mercer Island, US 5 30
Lingelbach, Jeston Kenmore, US 4 16
Shaffer, Kory Bothell, US 3 15
Shivashankara, Belur N Bellevue, US 7 115

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00