Multiple loop power generation using super critical cycle fluid with split recuperator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11840944
SERIAL NO

17543319

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for transferring and converting heat to a power cycle using a plurality of heat transfer fluids, loops and heat exchange devices to convert heat to useful work and/or power. Power is generated using intermediate heat transfer loops (IHTL) and an intermediate heat transfer fluid (IHTF) to cool the hot exhaust power cycle fluid (PCF) stream that is at or above its critical conditions. The temperature of the IHTF can be increased by 100° C., 150° C., 200° C., 250° C., 300° C., 350° C., 400° C., 450° C., 500° C., 550° C. or more by exchanging heat with the PCF, either directly or indirectly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XYZ ENERGY GROUP LLC5306 PINE WOOD MEADOWS LANE SPRING TX 77386

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huntington, Richard Alan Spring, US 7 18
Mittricker, Frank F Jamul, US 17 468
Starcher, Loren K Longboat Key, US 24 833

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00