Bond produced with an at least partially crystallized glass, such as a metal-to-glass bond, in particular a metal-to-glass bond in a feed-through element or connecting element, and method for producing such a bond, in particular in a feed-through element or connecting element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11840479
APP PUB NO 20190112225A1
SERIAL NO

16230523

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to a bond produced with an at least partially crystallized glass, such as a metal-to-glass bond, in particular a metal-to-glass bond in a feed-through element or connecting element, and to a method for producing such a bond, in particular in a feed-through element or connecting element. The at least partially crystallized glass includes at least one crystal phase and pores which are distributed in the at least partially crystallized glass in a structured manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHOTT AGGERMANY MAINZ MAINZ RHINELAND-PALATINATE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dahlmann, Ulf Landshut, DE 22 162
Hovhannisyan, Martun Frankfurt am Main, DE 12 14
Mitra, Ina Stadecken-Elsheim, DE 32 152
Mix, Christian Landshut, DE 14 8
Ramdohr, Björn Landshut, DE 6 2
Suffner, Jens Landshut, DE 14 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00