Piezoelectric material, piezoelectric element, and electronic equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11837975
APP PUB NO 20200169191A1
SERIAL NO

16775542

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A piezoelectric material includes: an oxide containing Na, Ba, Nb, Ti, and Mn, in which the oxide has a perovskite-type structure, a total amount of metal elements other than Na, Ba, Nb, Ti, and Mn contained in the piezoelectric material is 0.5 mol % or less with respect to a total amount of Na, Ba, Nb, Ti, and Mn, a molar ratio x of Ti to a total molar amount of Nb and Ti is 0.05≤x≤0.12, a molar ratio y of Na to Nb is 0.93≤y≤0.98, a molar ratio z of Ba to Ti is 1.09≤z≤1.60, a molar ratio m of Mn to the total molar amount of Nb and Ti is 0.0006≤m≤0.0030, and 1.07≤y×z≤1.50 is satisfied.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHATOKYO TOKYO METROPOLIS
FUJI CHEMICAL CO LTD3-2-33 HIGASHINODA-CHO MIYAKOJIMA-KU OSAKA-SHI OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imai, Hiroki Nakatsugawa, JP 15 128
Kubota, Makoto Yokohama, JP 219 2960
Maeda, Kenji Hirakata, JP 283 3363
Matsuda, Takanori Chofu, JP 98 805
Oshima, Kanako Tokyo, JP 42 123
Shimizu, Chiemi Hirakata, JP 18 104
Uchida, Fumio Daito, JP 30 196
Ueda, Miki Tokyo, JP 45 244
Yabuta, Hisato Machida, JP 64 18000

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00