Hybrid circuit breakers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11837865
APP PUB NO 20230198248A1
SERIAL NO

17557258

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one aspect, a hybrid circuit protection device for current-limiting a fault current between a source and a load during a fault is provided. The hybrid circuit protection device includes an input configured to couple to the source, an output configured to couple to the load, a return configured to couple the source to the load, a main switch configured to selectively couple the input to the output, a switching network coupled in parallel with the main switch, and a controller. The controller is configured to determine that the main switch has opened in response to the fault current, where the fault current has an initial value, and activate the switching network to current-limit the fault current to less than the initial value during the fault.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB S P AVIA VITTOR PISANI 16 20124 MILANO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jiang, Taosha Cary, US 10 16
Qi, Li Cary, US 30 292
Zhang, Yuzhi Apex, US 18 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00