Electrical conductor assembly, method for producing an electrical conductor assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11837805
APP PUB NO 20220336974A1
SERIAL NO

17719937

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical conductor assembly includes a line section having a plurality of conductor wires formed of a first electrically conductive material, a contact section in which the conductor wires are compacted to form a contact unit, and a layer formed of a second electrically conductive material. The layer is disposed on a contact surface of the contact unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TE CONNECTIVITY GERMANY GMBHAMPERESTRASSE 12-14 BENSHEIM 64625

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buechling, Chris Bensheim, DE 7 3
Eheim, Manuel Bensheim, DE 19 4
Kaehny, Frank Bensheim, DE 15 38
Kosmalski, Christoph Bensheim, DE 16 34
Lueck, Florian Bensheim, DE 1 0
Maurus, Rolf Bensheim, DE 1 0
Scheer, Kevin Bensheim, DE 13 126
Ulrich, Harald Bensheim, DE 12 18
Veihl, Maximilian Bensheim, DE 17 7
Wolf, Marcus Bensheim, DE 21 345

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00