Arrangement of a ground drilling device, method for operating a ground drilling device and use of an arrangement of a ground drilling device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11834921
APP PUB NO 20220243533A1
SERIAL NO

17582517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Arrangement of a ground drilling device for the pushing or pulling introduction of a drill string into the ground, wherein the arrangement has a frame and a carriage which can be moved back and forth relative to the frame with a translatory movement, wherein at least one rolling element is provided, which is configured to roll during the translatory movement of the carriage, and a conversion device is provided, which is connected to the rolling element and is configured to convert the rotary movement of the rolling element into a rotary movement of the drill string.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRACTO-TECHNIK GMBH & CO KGPAUL-SCHMIDT-STRASSE 2 LENNESTADT 57368

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schauerte, Manfred Schmallenberg, DE 17 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00