Suspension process for preparing ethylene copolymers in a reactor cascade

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11834531
APP PUB NO 20210198387A1
SERIAL NO

17252190

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for preparing a multimodal ethylene copolymer in suspension in a reactor cascade including a first polymerization reactor and subsequent polymerization reactor(s) including polymerizing ethylene and C3-C12-1-alkenes and forming a suspension of multimodal ethylene copolymer particles in a suspension medium made from or containing a diluent, transferring the suspension into a separator, wherein the suspension is separated into multimodal ethylene copolymer particles and recovered suspension medium, purifying part of the recovered suspension medium for producing purified components of the recovered suspension medium, and recycling part of the purified components of the recovered suspension medium to the first polymerization reactor of the reactor cascade, wherein the purified components of the recovered suspension medium recycled to the first polymerization reactor and made from or containing the diluent, undergo catalytic hydrogenation before being introduced into the first polymerization reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASELL POLYOLEFINE GMBH50389 WESSELING

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carvajal, Rodrigo Bonn, DE 6 17
Damm, Elke Bad Vilbel, DE 23 44
Kuehl, Reinhard Bornheim, DE 15 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00