Apparatus for optically counting discrete objects

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11833112
APP PUB NO 20210361530A1
SERIAL NO

16880816

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses an apparatus for counting discrete objects, said apparatus comprises of a hopper 1; an incline feeder 2 containing an inlet and an outlet; a single optical zone that allows detection of the discrete objects 10 entering from the feeder outlet; a controller which provides the count of the discrete objects; a screen for displaying the count of the discrete objects; wherein the incline feeder outlet is arranged orthogonally to the optical zone. The present invention discloses a method for counting discrete objects comprising the steps of inputting the discrete objects 10 into the hopper 1; passing the discrete objects through the incline feeder 2 such that they enter into the optical zone; optical zone sensing the entering discrete object 10 and transmitting a signal to the controller; displaying the count on a screen; dispensing the counted discrete objects.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELECTRONIC ENGINEERING LLC14 CONNECTICUT CT MATAWAN NJ 07747

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dworkin, Emily Matawan, US 1 0
Dworkin, Samuel Matawan, US 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00