Direct current plug, direct current socket and electric equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11831104
SERIAL NO

17295388

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a direct current (DC) plug, a DC socket and electric equipment. The DC plug is configured to be connected to a DC socket to supply power to an electrical equipment. The DC plug includes: a center contact, including a first center contact side surface, a second center contact side surface, a third center contact side surface and a fourth center contact side surface, wherein the first center contact side surface and the second center contact side surface are oppositely disposed, and the third center contact side surface and the fourth center contact side surface are oppositely disposed; first plug current conductors, disposed on the first center contact side surface and the second center contact side surface; and second plug current conductors, disposed on the third center contact side surface and the fourth center contact side surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GREE ELECTRIC APPLIANCES INC OF ZHUHAIZHUHAI GUANGDONG 519070

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Lei Guangdong, CN 645 4033
Li, Qiulian Guangdong, CN 2 0
Li, Xiangqian Guangdong, CN 18 29
Yuan, Jinrong Guangdong, CN 6 1
Zhao, Zhigang Guangdong, CN 35 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00