Fuel cell stack and operation method for fuel cell stack

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11831059
SERIAL NO

17586500

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to the present embodiment, a fuel cell stack comprises a cell stack having a plurality of unit cells stacked therein, each of the unit cells including an electrolyte membrane, a fuel-electrode porous passage plate, and an oxidant-electrode porous passage plate, wherein in the cell stack, at least a part of one main surface of a conductive fuel-electrode porous passage plate is in contact with one main surface of a conductive oxidant-electrode porous passage plate, and a capillary force of water contained in a hydrophilic micropores of the conductive fuel-electrode porous passage plate and the conductive oxidant-electrode porous passage plate prevents an oxidant gas in an oxidant-electrode passage and a fuel gas in a fuel-electrode passage from directly mixing together.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBATOKYO 105-8001
TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION72-34 HORIKAWA-CHO SAIWAI-KU KAWASAKI-SHI KANAGAWA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Yuma Kawasaki Kanagawa, JP 3 0
Maekawa, Akira Kawasaki Kanagawa, JP 30 157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00