Jet pump spool valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11828302
SERIAL NO

17521492

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A jet valve includes a valve body, a juncture operatively coupled to the valve body. The juncture having a first fluid connection fluidly coupled to a header tank and a second connection fluidly coupled to a storage tank. A spool is movably disposed within the valve body. A jet pump is fluidly coupled to a fuel pump of the header tank via a bleed line. Operation of the fuel pump pressurizes the bleed line and moves the spool to a first position to (i) close a first fluid path between the header tank and the storage tank and (ii) provide a second fluid path between the header tank and the storage tank, the second fluid path through the aperture. Depressurization of the bleed line enables the spring to move the spool to a second position to close the second fluid path and open the first fluid path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INSITU INC (A SUBSIDIARY OF THE BOEING COMPANY)118 EAST COLUMBIA RIVER WAY BINGEN WA 98605

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sauer, Robert Hood River, US 11 265

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00