Control device, control method, and program

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11828225
APP PUB NO 20230014316A1
SERIAL NO

17953704

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device for adjusting an amount of fuel to be supplied to a gas turbine based on a rotational speed of the gas turbine, such that a frequency of electric power output by a power generator that generates electric power using the gas turbine is within a given range, includes a load value acquisition unit configured to acquire a load value that is a value of a load applied to the power generator after cutoff of a part of the load applied to the power generator when the part of the load applied to the power generator is cut off, an arithmetic unit configured to calculate an adjusted value that is a value of the load different from the load value by carrying out an arithmetic operation on the load value and a bias, and a command unit configured to adjust the amount of fuel by outputting a first signal for causing the power generator to output electric power corresponding to the adjusted value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTD16-5 KONAN 2-CHOME MINATO-KU TOKYO 108-8215

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kitauchi, Yosuke Yokohama, JP 4 4
Saito, Akihiko Tokyo, JP 86 1529
Sasahara, Jun Yokohama, JP 39 515
Tanaka, Mizuhiko Yokohama, JP 1 0
Yamashita, Hidekazu Yokohama, JP 11 117
Yano, Koichiro Yokohama, JP 7 51
Yoshida, Masahiro Yokohama, JP 528 5298

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00