Method of manufacturing multi-hardness and multi-elasticity foam mattress by use of continuous foaming process and foam mattress manufactured thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11826931
APP PUB NO 20210206035A1
SERIAL NO

16073582

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a multi-hardness and multi-elasticity foam mattress in which a plurality of foam blocks are formed integrally with each other by use of a continuous foaming process the method comprising the steps of: arranging a plurality of nozzles above one end of a molding plate; installing a separation wall between two adjacent ones of the respective nozzles arranged at the molding plate; laminating a release paper on the top of the molding plate; spraying foaming solutions from the nozzles, respectively, wherein the release paper moves in a direction toward the other end of the molding plate corresponding to a moving speed of the foaming solution; and molding a foam body having a plurality of zones where a plurality of unit foam blocks have multi-hardnesses and multi-elasticities.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DUT KOREA CO LTD(HWAJEON-DONG) 173 HWAJEONSANDAN 1-RO GANGSEO-GU BUSAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeong, Yong Chai Busan, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00