Pre-charge current control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11824397
APP PUB NO 20200358307A1
SERIAL NO

16960173

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for controlling a pre-charge current generated when electrically connecting a first terminal and a second terminal, according to one embodiment of the present invention, may comprise: a switch for controlling a magnitude of a current flowing between the first terminal and the second terminal; a first resistor for generating a base voltage of a first transistor in proportion to a magnitude of the pre-charge current flowing between the first terminal and the second terminal; the first transistor for limiting the magnitude of the pre-charge current when a voltage generated by the first resistor is equal to or greater than a predetermined threshold voltage; a photocoupler for receiving, in a state insulated from a first power source, an optical signal from the first power source and supplying power; a capacitor charged by the power supplied by the photocoupler; a second transistor for controlling the magnitude of the pre-charge current on the basis of a charging voltage of the capacitor; and a second resistor for controlling an operating time of the second transistor along with the capacitor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG SDI CO LTDYONGIN-SI GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeon, Peelsik Yongin-si, KR 6 1
Moon, Soodeok Yongin-si, KR 28 32
Park, Kyunghoon Yongin-si, KR 6 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00