Positive electrode active material for all-solid-state lithium secondary batteries

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11824188
APP PUB NO 20210135199A1
SERIAL NO

16638627

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A positive electrode active material for an all-solid-state lithium secondary battery, which is capable of improving the rate characteristics, the cycle characteristics, and the initial charge and discharge efficiency even in the case where a sulfide-based solid electrolyte is used, wherein the surface of a lithium-containing composite oxide, referred to as present core particles, is coated with a compound, referred to as, LiAO compound, containing Li, A, where A represents one or more elements selected from the group consisting of Ti, Zr, Ta, Nb, Zn, W, and Al, and O; and a halogen is present on the surface of the present core particles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUI MINING & SMELTING CO LTDJAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ide, Hitohiko Ageo, JP 25 196
Washida, Daisuke Ageo, JP 12 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00