Clustered database reconfiguration system for time-varying workloads

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11822529
APP PUB NO 20220414076A1
SERIAL NO

17903733

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system may forecast a plurality of workload measurements for a database management system (DBMS) at respective times based on a workload model. The system may determine, based on the forecasted workload measurements, configuration parameter sets optimized for the DBMS at the respective times. The system may generate a reconfiguration plan. The system may determine performance that would result from reconfiguring nodes of the DBMS with the configurations parameter sets. The system may select a reconfiguration plan in response to the performance satisfying a fitness criterion. The system may cause, at the reconfiguration times, the nodes to begin reconfiguration with the configuration parameter sets included in the selected reconfiguration plan.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PURDUE RESEARCH FOUNDATION101 FOUNDRY DR SUITE 2500 WEST LAFAYETTE IN 47906

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bagchi, Saurabh West Lafayette, US 22 253
Chaterji, Somali West Lafayette, US 8 14
Mahgoub, Ashraf West Lafayette, US 5 12
Wood, Paul Curtis Lafayette, US 2 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00