Processor-based system employing configurable local frequency throttling management to manage power demand and consumption, and related methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11822414
APP PUB NO 20220253120A1
SERIAL NO

17170418

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Processor-based systems employing configurable local frequency throttling management to manage power demand and consumption, and related methods. For example, such processor-based systems may include a processor and other power circuitry to control power to the processor. The processor includes a clock control circuit that is configured generate a clock signal(s) at a designated frequency to clock a processor core(s) in the processor at a desired operating frequency(ies). The clock control circuit is configured to dynamically throttle (i.e., limit and/or reduce) the frequency(ies) of a clock signal(s) clocking the processor in response to a frequency throttle event that may be an unexpected event. Reducing power demand may be important to ensure that the processor can continue to operate under interrupted or reduced power supply conditions. It may be faster to throttle the operating frequency of a processor than to throttle the operating voltage of power supplied to the processor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICROSOFT TECHNOLOGY LICENSING LLCONE MICROSOFT WAY REDMOND WA 98052

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balasubramanian, Venkatesh San Jose, US 18 424
Gladding, Derek E Poughquag, US 12 18
Maldonado, Cesar Mountain View, US 3 16
Rapaka, Smitha L San Jose, US 6 7
Vemula, Sunil K Sunnyvale, US 6 93
Xu, Xiaoling Cuppertino, US 58 298

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00