Block-type prefabricated ramp

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11821213
APP PUB NO 20230304292A1
SERIAL NO

18033860

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A block-type modular ramp is to be provided in a place where a step or bump is formed. The block-type modular ramp includes block bodies arranged in a horizontal direction and stacked vertically to form a backbone, a fastening member for fastening the block bodies arranged in the horizontal direction to each other, a fixing pin for fixing the block bodies stacked vertically to each other, a fixing member coupled to the block bodies and fixing the block bodies to a floor surface where to install the ramp, fastening grooves formed in the block bodies, and fixing holes formed in the block bodies in an up-down direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUMAN TECHNOLOGY & COMPLEX CO LTD30 BUCHEON-RO 391BEON-GIL BUCHEON-SI GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Hee Sub Gyeonggi-do, KR 5 0
Kim, Sam Young Gyeonggi-do, KR 15 31
Lee, Dong Kwang Seoul, KR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00