Electric concrete transportation cart

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11820381
APP PUB NO 20210229664A1
SERIAL NO

17152218

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrically powered, self-propelled cart for safely delivering heavy loads, such as concrete, within job sites with unlevel, irregular, or sloped terrain. A cargo bucket is tiltable over front drive wheels for transporting and dumping cargo. Electric drive motors associated with a transaxle propel wheels at a selectable speed in response to an electric control module. A steering column rotates in response to manually operated handle bars and activates a sensor to generate signals delivered to the control module for throttle adjustments. The sensor may be a linear potentiometer, a rotary differential transformer or a rotary encoder or shaft encoder measuring angular displacement. Extreme steering displacements will electrically reduce cart speed notwithstanding the previous speed setting chosen by the operator through the steering column.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALLEN ENGINEERING CORPORATIONP O BOX 819 PARAGOULD AZ 72451

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Waldon, Edward Andrew Paragould, US 5 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00