Powder press having toggle lever drive and electric drive

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11820094
APP PUB NO 20210016534A1
SERIAL NO

16968853

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a powder press (1) for producing a pressed article from a material that can be pressed, having a press frame (10), an upper and/or lower punch assembly (14) and a die assembly, which define a molding cavity, into which the material that can be pressed can be introduced, and an electric drive unit (12) which is operatively connected to the punch assemblies (14) and/or the die assembly, wherein, in order to mold the pressed article, the punch assemblies (14) and the die assembly can be moved relative to each other along a pressing axis (18) and pressed against each other by means of the electric drive unit (12). Furthermore, the operative connection between the electric drive unit (12) and one of the punch assemblies (14) comprises a toggle lever drive (16) which moves the punch assembly (14) into a pressing end position along the pressing axis (18).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSTERWALDER AG3250 LYSS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hänni, Roland Zurich, CH 1 1
Maissen, Curdin Wetzikon, CH 2 5
Sollberger, Michael Lyss, CH 2 1
Wehrli, Alex Kehrsatz, CH 9 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00