Extrusion methods wherein material is guided through a passage crossing over between adjacent cylindrical bodies

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11820062
APP PUB NO 20210316492A1
SERIAL NO

17355997

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A screw includes a screw main body, a conveyance portion conveying a raw material, and a passage provided in the screw main body. The passage includes a first passage element, a second passage element, and a third passage element. The screw main body has a plurality of cylindrical bodies arranged in an axial direction of the rotating shaft. At least a portion of the conveyance portion is formed on outer peripheral surfaces of the cylindrical bodies adjacent to each other, and the passage is formed in the cylindrical body so as to cross over between the adjacent cylindrical bodies.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIBAURA MACHINE CO LTDTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Shigeyuki Numazu, JP 33 564
Kobayashi, Akiyoshi Fuji, JP 35 1049
Sameshima, Takafumi Mishima, JP 24 242
Shimizu, Hiroshi Tsukuba, JP 514 5554

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00