Method of rapid conversion of chemical energy into usable electrical energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11817713
SERIAL NO

16825045

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system using Faraday's law to rapidly direct convert the kinetic energy of a magnetized and/or conducting projectile into usable electrical energy. The system includes a barrel comprising a bore; a circuit including a plurality of electrically conductive components distributed along a length of the bore; and a projectile comprising at least one of a conductive material or a magnetic material magnetically coupled to the electrically conductive components when the projectile is moving along the length of the bore. The circuit stores energy generated from an electric current induced in the electrically conductive components when the projectile moving along the length of the bore causes a magnetic interaction between the electrically conductive components and the magnetic material or the conductive material. The magnetic interaction also causes braking of the projectile.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE BOEING COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grossnickle, James A Bellevue, US 22 120

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00