Systems and methods for onboard, real-time pickup blending for electric guitars and basses
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Nov 14, 2023
Grant Date -
Feb 16, 2023
app pub date -
Jan 31, 2022
filing date -
Aug 9, 2021
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
Systems and methods for onboard, real-time pickup blending for electric guitars/basses may utilize every possible tonal combination that double coil pickups can offer. The industry standard pickup toggle switch may be removed from electric guitar/bass instruments. Instead of a user being limited to only using one pickup at a time to be selected, the user may mix in any combination of the pickups (top, bottom, or both) at any time. Accordingly, multiple pickups can be on at the same time and/or the user may blend in (or out) any percentage of any of the pickups that the user wishes to create a large combination of tones.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
ELLIS MARK | CYPRESS TX |
International Classification(s)

- 2022 Application Filing Year
- G10H Class
- 292 Applications Filed
- 81 Patents Issued To-Date
- 27.74 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Ellis, Mark | Cypress, US | 46 | 389 |
# of filed Patents : 46 Total Citations : 389 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- G10H Class
- 0 % this patent is cited more than
- 2 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | May 14, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | May 14, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | May 14, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Nov 09, 2021 | P | Publication | |
Oct 20, 2021 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Oct 11, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Sep 16, 2021 | P | Published | |
Jul 06, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
Jun 05, 2021 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO SMALL (ORIGINAL EVENT CODE: SMAL); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
Jan 15, 2019 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
Jul 17, 2017 | F | Filing | |
Jul 17, 2017 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:WARD, NICHOLAS;REEL/FRAME:056494/0868 Owner name: EINSTEIN IP LIMITED, GREAT BRITAIN Effective Date: Jul 17, 2017 |
Jul 15, 2016 | PD | Priority Date |

Matter Detail

Renewals Detail
