Gravity compressed air energy storage system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11815071
SERIAL NO

18329862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The gravity compressed air energy storage system includes: a shaft, into which a pressure-bearing cylinder is movably inserted; a locking component arranged at a top of the pressure-bearing cylinder to support the pressure-bearing cylinder on a ground at a top of the shaft through the locking component in case that the pressure-bearing cylinder is at a lowest limit position; a primary gravity block arranged above the locking component; a spherical connection component arranged and spherically connected between the primary gravity block and the locking component; in which a plurality of guide components are arranged around the primary gravity block; and a plurality of guide rails arranged on the ground and at a peripheral side of the primary gravity block; in which the plurality of guide rails cooperate with the plurality of guide components.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XI'AN THERMAL POWER RESEARCH INSTITUTE CO LTDNO 136 XINGQING ROAD BEILIN DISTRICT XI'AN CITY SHAANXI PROVINCE XI'AN CITY SHAANXI PROVINCE 710048

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Haiwei Shaanxi, CN 2 0
Ji, Haimin Shaanxi, CN 3 0
Li, Yang Shaanxi, CN 1182 7549
Liu, Shuchang Shaanxi, CN 5 0
Qin, Haifeng Shaanxi, CN 6 5
Song, Xiaohui Shaanxi, CN 11 8
Wen, Jun Shaanxi, CN 25 100
Yang, Chenglong Shaanxi, CN 15 29
Yu, Zaisong Shaanxi, CN 6 0
Zhao, Hanchen Shaanxi, CN 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00