Drill planning tool for topography characterization, system and associated methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11814950
SERIAL NO

17501438

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A planning tool plans movement of a boring tool for an underground drilling operation. The planning tool includes one or more wheels for rolling on a surface of the ground along a path responsive to movement by an operator to characterize the surface contour and to generate guidance for the boring tool to reach a target position. Planning can additionally be based on waypoints. The planning tool can be rolled unidirectionally or bidirectionally to characterize the surface contour. Bidirectional movement cancels accelerometer fixed bias. Path stitching is used to plan around obstacles. The planning tool can facilitate tracker placement. The planning tool can collect noise information for frequency selection purposes. A described technique maximizes linear drilling in an underground plan. Compensation and/or warnings are provided for unsteady, fast and slow movement of the planning tool while measuring the surface contour.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MERLIN TECHNOLOGY INC19625 62ND AVE SOUTH STE B-103 KENT WA 98032

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bayliss, Timothy Maple Valley, US 16 38
Caswell, Craig Stanwood, US 9 34
Shaw, Timothy Auburn, US 8 117
Zeller, Rudolf Seattle, US 89 1181

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00