Titanium material for hot working

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11814703
SERIAL NO

17338775

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a titanium composite material 1 including: a first surface layer portion 2; an inner layer portion 4; and a second surface layer portion 3; wherein: the first surface layer portion 2 and the second surface layer portion 3 are composed of a titanium alloy; the inner layer portion 4 is composed of a commercially pure titanium including pores; a thickness of at least one of the first surface layer portion 2 and the second surface layer portion 3 is 2 μm or more, and a proportion of the thickness with respect to an overall thickness of the titanium composite material 1 is 40% or less; and a porosity in a cross section perpendicular to a sheet thickness direction is more than 0% and 30% or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Hideki Tokyo, JP 140 728
Kitaura, Tomoyuki Tokyo, JP 7 0
Shirai, Yoshihisa Tokyo, JP 9 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00