System and method of providing a projectile module having a net with a drawstring

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11814190
APP PUB NO 20230192298A1
SERIAL NO

18111758

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A projectile cartridge that can be removably attached to a flying vehicle is disclosed. A system can include a first flying vehicle, a projectile attachment mechanism configured with the first flying vehicle, a projectile cartridge that contains a projectile, the projectile cartridge being removably attachable to the projectile attachment mechanism, a weight attached to the projectile, the weight being configured in a releasable configuration in the projectile cartridge and a drawstring configured with the projectile. After firing the projectile, when tension is applied to the drawstring as the projectile approaches or envelops a second flying vehicle, the tension can cause the drawstring to close the projectile down to secure the second flying vehicle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORTEM TECHNOLOGIES INC2015 W GROVE PARKWAY PLEASANT GROVE UT 84062

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gooch, Robert Edmund Orem, US 7 17
Lebaron, Devin Donald Saratoga Springs, US 8 5
Robertson, Adam Eugene Provo, US 11 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00