Extruder screw having paths within the screw, extruder, and extrusion method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11813785
APP PUB NO 20210354362A1
SERIAL NO

17386635

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conveyance portion, a barrier portion, and a path are provided at places of a portion of a screw main body in which a kneading portion is provided. In at least one of the places, an entrance is opened to cause raw materials, conveyance of which is limited by a barrier portion to increase pressure on the raw materials, to flow in. The raw materials flowing in from the entrance flow through the path in the opposite direction to a conveyance direction of the conveyance portion. An exit is opened in an outer circumferential surface of the screw main body at a position outside the conveyance portion in which the entrance is opened.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIBAURA MACHINE CO LTDTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Shigeyuki Numazu, JP 33 564
Kobayashi, Akiyoshi Fuji, JP 35 1049
Sameshima, Takafumi Mishima, JP 24 242

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00