Multi-layer electomagnetic shielding composite

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11812597
SERIAL NO

17090328

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-layered material is provided for shielding low-frequency electromagnetic waves. The multi-layered material may include a plurality of repeating sets of alternating layers of materials. Each repeating set of alternating layers may include an electrically conductive layer and a magnetic layer including a continuous layer of a magnetic material. The multi-layered material is generally configured to shield electromagnetic waves having a frequency of less than about 1 MHz. In various aspects, the electrically conductive layer may include a conductive metal layer, or a two-dimensional transitional metal carbide. The multi-layered material may be provided as a thin film, or can be shaped or sized as flakes for use with a resin composite that is deposited via a spray application technique.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Banerjee, Debasish Ann Arbor, US 164 1614
Nishijima, Hiroki Nisshin, JP 28 153
Su, Xiaoshi Ann Arbor, US 24 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00