System for continuously detecting temperature and composition of molten steel during converter steelmaking

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11808635
SERIAL NO

17254704

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a system for continuously detecting the temperature and composition of molten steel during converter steelmaking, and relates to the technical field of steelmaking detection devices. A seating brick (3) and a probe conveying pipe (5) are provided on a side wall of a converter (1), and multiple probes are provided in different detection through holes (4) within the probe conveying pipe (5) respectively. The temperature of molten steel, the oxygen activity of the molten steel and the low carbon and phosphorus content in the molten steel within the converter can be detected in real time. This facilitates an operator adopting corresponding operational means to reach the smelting end point in an optimized manner so as to improve various economic and technical indexes in steelmaking.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LIEN CHUSHANGHAI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lian, Young Shanghai, CN 1 0
Lien, Chu Shanghai, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00