Production of glass from a mixture comprising calcium oxide, and glass furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11807567
APP PUB NO 20200156980A1
SERIAL NO

16625953

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a glass production method comprising the production of a glass precursor mixture for a glass furnace, in which water, sand and sodium carbonate are mixed in weight proportions of between 0 and 5%, 40 and 65%, and greater than 0 and at most 25% respectively, and, after at least 10 minutes, calcium oxide is added in a weight proportion of between 1 and 20% of the total. The invention relates to a method for producing glass using a mixture containing, in particular, calcium oxide, and a glass melting furnace, said method and furnace using a burner with a flame directed at the glass batch.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARC FRANCE62510 ARQUES

International Classification(s)

loading....
  • 2018 Application Filing Year
  • C03C Class
  • 1002 Applications Filed
  • 655 Patents Issued To-Date
  • 65.37 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances201820192020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bonningues, Jean-Marie Arques, FR 3 2
Charles, Herve Arques, FR 2 1
Donze, Sebastien Arques, FR 3 1
Famchon, Francois Arques, FR 2 1
Ibled, Xavier Arques, FR 5 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • C03C Class
  • 0 % this patent is cited more than
  • 2 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges55074201 - 1011 - 200255075100125150175200225250275300325350375400425450475500525550575600

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035