Composite insulated boxcar floor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11807280
APP PUB NO 20210146968A1
SERIAL NO

17097225

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A floor section for an insulated railcar includes a floor plate and a composite section coupled to the floor plate. The composite section includes a plurality of composite beams aligned parallel to one another. Each composite beam of the plurality of composite beams includes an inner core and an outer material surrounding the inner core. The inner core includes an insulating material and is configured to support the outer material. An upper surface of each composite beam of the plurality of composite beams, which extends along a length of the composite beam, is coupled to an underside of the floor plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRINITY RAIL GROUP LLC14221 N DALLAS PARKWAY DALLAS TX 75254

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barzey, Codrington E Melbourne, US 4 0
Cribbs, Ricky A Ovilla, US 8 41
Huck, Kenneth W Fairview, US 59 111
Lewit, Scott M Indialantic, US 23 594
Morales, Marco A Flower Mound, US 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00