System and method for increasing density of structural composites

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11806944
APP PUB NO 20210252804A1
SERIAL NO

17306620

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a method for making a high density structural composite includes depositing a plurality of fibrous materials on or adjacent a first plate or surface. A polymer liquid is deposited onto the plurality of fibrous materials to form a composite mixture. A first cyclic pressure is applied onto the composite mixture to compress the composite mixture. In some embodiments, the cyclic pressure may then be reduced to a valley pressure to complete a pressurization cycle. In some instances, the valley pressure may be below atmospheric pressure to induce trapped air and volatile gases to escape from the composite mixture before curing. The pressurization cycle may be repeated. A second pressure, which may be a constant pressure in some embodiments, may be applied to the composite mixture using, in some embodiments, a second plate until the polymer liquid has at least partially cured or partially solidified.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEGERSTROM LANESTRATFORD TX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Segerstrom, Lane Stratford, US 12 57

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00