Toaster and control system for a toaster

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11805944
SERIAL NO

16993822

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A toaster includes a housing having a slot for receiving a food item, a heating element associated with the slot for toasting the food item, a carriage assembly having a supporting rack movably mounted in the slot for supporting the food item within the slot, a first slider member connected to the supporting rack, and a second slider member operatively connected to the first slider member, a motor, and a driving member having a first end operatively connected to the motor and a second end received in a slot in the second slider member such that when the motor is driven to rotate the driving member, the driving member drives the supporting rack, via the first slider member and the second slider member, to slidably move within the slot.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONAIR LLC1 CUMMINGS POINT ROAD STAMFORD CT 06902

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lai, Kin Man New Territories, HK 42 618
Tse, Lai Man Aberdeen, HK 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00