Method for controlling an uninterruptable power supply

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11804731
APP PUB NO 20220224149A1
SERIAL NO

17573354

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling an uninterruptable power supply arranged between a grid and a variable load, the uninterruptable power supply includes a DC link interconnecting a rectifier connected to the grid via a grid switch, an energy storage and an inverter connected to the load, and a switchable bypass connected between the grid switch and the load and in parallel with the path formed by the rectifier, the DC link and the inverter, the method includes monitoring a power supply of the grid, comparing the power supply to a load requirement of the load, if the power supply meets the load requirement, closing the grid switch, and switching on the bypass, to supply the load with AC current from the grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB SCHWEIZ AGBRUGGERSTRASSE 66 BADEN 5400

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Colombi, Silvio Losone, CH 50 498
Mannuccini, Andrea Riazzino, CH 16 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00