Manufacturing frame

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11795595
APP PUB NO 20190119843A1
SERIAL NO

16168364

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing frame comprises one or more alignment tabs. Each alignment tab comprises an alignment element. The alignment element interacts with a corresponding alignment element at a manufacturing station to identify to the manufacturing station the position and orientation of the frame. The frame supports a flexible material in a known position and orientation relative to the frame, allowing the manufacturing station to infer the position and orientation of the flexible material on the frame from the interaction of the alignment elements on the frame and the manufacturing station.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIKE INCONE BOWERMAN DRIVE BEAVERTON OR 97005-6453

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baggen, Jared S Portland, US 9 16
Barney, Bruce Alan Portland, US 5 22
DeHaven, Daniel B Sherwood, US 6 16
Kilgore, Bruce J Lake Oswego, US 132 5718
Terlizzi, John Joseph Austin, US 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 24, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00