Multi-function tool with laminated plier jaws

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11794313
APP PUB NO 20200306935A1
SERIAL NO

16828599

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-purpose tool includes a first handle, a second handle, and a laminated plier jaw assembly coupled to the first handle and the second handle. The laminated plier jaw assembly includes a first outer layer, a second outer layer, an inner layer, and a pin. The first outer layer defines a first aperture. The second outer layer defines a second aperture. The inner layer is positioned between and is coupled to the first outer layer and the second outer layer. The inner layer defines a slot having a narrow portion positioned between a first wide portion and a second wide portion. The pin extends at least partially through the first aperture, the second aperture, and the slot. The first outer layer, the second outer layer, and the inner layer cooperate to define a pair of jaws that rotate relative to one another about an axis of rotation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FISKARS BRANDS INC2537 DANIELS STREET MADISON WI 53718-6772

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bessac, Grant Beaverson, US 6 11
Hallbrook, Paul Portland, US 1 3
Johnson, Brayden C Beaverton, US 1 3
Moore, Eric Portland, US 43 844

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 24, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00