Material conveyance system in a combine harvester

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11793115
SERIAL NO

17161181

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combine harvester is provided with a conveyance system for transporting crop material discharged by overhead grain separating apparatus to a grain cleaning shoe. The conveyance system comprises a series of oscillating pans which move the grain in a generally longitudinal direction. A return pan conveys the collected material forwardly to a front discharge edge from where the material falls onto a stratification pan below. The stratification pan conveys the collected material rearwardly to a rear discharge edge from where the material falls into the grain cleaning shoe. At least one of the return pan and the stratification pan is non-rectangular and has a non-transverse discharge edge.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AGCO INTERNATIONAL GMBHVICTOR-VON-BRUNS STRASSE 17 NEUHAUSEN CH-8212

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bilde, Morten Leth Langaa, DK 37 116
Jensen, Kenneth Düring Randers, DK 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 24, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00