Power conversion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11791712
APP PUB NO 20210013796A1
SERIAL NO

16975408

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion device converts a direct-current power on the DC side of the power conversion device to an alternating-current power by an inverter circuit having a plurality of semiconductor switching elements, and outputs the AC power from the AC side of the power conversion device. A current detector detects a reactor current output from the inverter circuit. As overcurrent detector detects overcurrent in a control mode in which the reactor current is caused to follow a reactor current command value, control circuit starts an overcurrent mode in which a time period where the reactor current monotonically decreases is provided. In the overcurrent mode, whether to switch the overcurrent mode to the normal control mode is determined based on the reactor current or in accordance with a timing corresponding to a zero-cross point of a voltage or current on the AC side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO 100-8310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amimoto, Takeshi Tokyo, JP 10 20
Izumi, Kikuo Tokyo, JP 26 124
Kimura, Tomoaki Tokyo, JP 90 882
Okuda, Tatsuya Tokyo, JP 34 588

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 17, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00