High precision air bearing stage with capability of parasitic error compensation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11784084
APP PUB NO 20230163016A1
SERIAL NO

17668425

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high precision air bearing stage for wafer inspection and a method of runout errors detecting and compensating. The air bearing stage includes a base block, a crossbeam mounted on the base block, a sliding table configured to carry a compensation stage, a motor and a grating ruler used to drive the sliding table to move along the crossbeam, sensors used for monitoring the position of the sliding table in real time, air-bearing used for supporting the sliding table, and a compensation stage configured to compensate the runout errors of the air bearing stage based on the real-time detecting data from the sensors. The air-bearing includes a first air-bearing, a second air-bearing and a third air-bearing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANYING MOTIONCONTORL(TIANJIN) INSTRUMENT CO LTDBUILDING C21 VENTURE HEADQUARTERS NORTH OF FUYUAN ROAD WUQING DISTRICT TIANJIN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jia, Jing Tianjin, CN 17 362
Liu, Hao Tianjin, CN 555 2317
Xu, Ying Tianjin, CN 214 1814

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00