Transition metal-catalyzed production of alcohol and carbonyl compounds from hydrocarbons

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11780786
SERIAL NO

17470066

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Processes for converting a hydrocarbon reactant into an alcohol compound and/or a carbonyl compound are disclosed in which the hydrocarbon reactant and a supported transition metal catalyst—containing molybdenum, tungsten, or vanadium—are irradiated with a light beam at a wavelength in the UV-visible spectrum, optionally in an oxidizing atmosphere, to form a reduced transition metal catalyst, followed by hydrolyzing the reduced transition metal catalyst to form a reaction product containing the alcohol compound and/or the carbonyl compound.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEVRON PHILLIPS CHEMICAL COMPANY LP10001 SIX PINES DRIVE THE WOODLANDS TX 77380

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barr, Jared L Bartlesville, US 31 165
Clear, Kathy S Bartlesville, US 110 819
Cruz, Carlos A Kingwood, US 80 299
Ellis, William Chad Bartlesville, US 1 2
McDaniel, Max P Bartlesville, US 560 19791
Monwar, Masud M Bartlesville, US 25 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00