The present invention relates to a method and a system of commissioning elevator, and an elevator system. The method includes obtaining at least one operation data of at least one elevator door, comparing the operation data with corresponding criterion operation data, and determining whether a deviation between the operation data and the criterion operation data exceeds a pre-set range, and if so, triggering a control over at least one control end relevant to the operation of the elevator door to make a deviation between the operation data re-obtained and the criterion operation data fall within the pre-set range. The invention will increase the efficiency in elevator commissioning and remove the adverse effects on elevator operation caused by factors such as “Stack Effect”, and thereby ensure good working condition and high security of elevators.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OTIS ELEVATOR COMPANYONE CARRIER PLACE FARMINGTON CT 06032

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cai, Xing Shanghai, CN 11 20
Jing, Buyun Shanghai, CN 4 18
Li, Changle Shanghai, CN 23 59
Li, Keyu Shanghai, CN 7 19
Li, Yun Shanghai, CN 251 1680
Mosher, Daniel A Glastonbury, US 42 225
Zhou, Haitao Shanghai, CN 81 170

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00