Heat exchanger and manufacturing method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11779994
APP PUB NO 20220410247A1
SERIAL NO

17845556

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heat exchanger includes a plurality of heat transfer tubes housed in a predetermined case, a connecting tube body for connecting the plurality of heat transfer tubes, a predetermined tube expansion portion provided on each heat transfer tube, a first peripheral wall portion provided on the tube expansion portion, and a second peripheral wall portion that is positioned on an end portion of the connecting tube body and fitted to the tube expansion portion, wherein the first and second peripheral wall portions have different sectional shapes and are fitted together in a partial contact state including predetermined contact and non-contact portions. According to this configuration, the heat transfer tubes can be fixed to a side wall portion of the case and the connecting tube body can be connected to the heat transfer tubes easily and appropriately.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORITZ CORPORATION93 EDOMACHI CHUO-KU KOBE-SHI HYOGO 650-0033

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujisawa, Hideyuki Kobe, JP 20 60
Se, Naoki Kobe, JP 11 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00