Micro-electronic package with substrate protrusion to facilitate dispense of underfill between a narrow die-to-die gap

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11776821
SERIAL NO

17669288

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A substrate protrusion is described. The substrate protrusion includes a top portion that extends in a first direction toward a gap between the first die and the second die and in a second direction parallel to the gap between the first die and the second die. The substrate protrusion also includes a base portion that is coupled to a substrate that extends underneath the first die and the second die. An encapsulant is over the protrusion of the substrate, the encapsulant extending beneath the first die, and the encapsulant extending beneath the second die.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATIONSANTA CLARA CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ananthakrishnan, Nisha Chandler, US 35 149
Cetegen, Edvin Chandler, US 50 171
Gujjula, Sushrutha Chandler, US 5 4
Lin, Ziyin Chandler, US 56 18
Mehta, Vipul Chandler, US 13 15
Wei, Yuying Chandler, US 6 12
Zhong, Shan Chandler, US 52 606

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00