Spark coil with the lead terminal between flanges

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11776740
APP PUB NO 20230123021A1
SERIAL NO

17587737

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A spark coil includes: a center core; a primary coil disposed on an outer periphery of the center core; a secondary coil disposed on an outer periphery of the primary coil; and an output terminal electrically connected to the secondary coil. The secondary coil includes a tubular secondary bobbin having a plurality of flanges on an outer peripheral side thereof, a secondary conductive wire wound around the secondary bobbin, and a long-sheet-shaped secondary lead terminal having one and another end portions electrically connected to the secondary conductive wire and the output terminal, respectively. The secondary lead terminal is disposed, between corresponding ones of the flanges, in surface contact with none of side surfaces of the flanges.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Suzuki, Daisuke Tokyo, JP 280 2087
Yamada, Shuji Tokyo, JP 113 1635

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00