Fuel line, method for producing same, and uses thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11772369
APP PUB NO 20200406590A1
SERIAL NO

16956924

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-layer composite in the form of a hollow body enclosing an interior space (2) is proposed, consisting of three or four layers: an inner layer (3) adjoining the interior space (2), a middle layer (4) adjoining the latter and an outer layer (5) adjoining the middle layer (4) and closing the multi-layer composite (1) to the outside. If necessary, there is a further innermost layer (8) which directly adjoins the said inner layer (3) and is equipped with a conductive finish. The inner layer (3) is based on polyamide 6, the middle layer (4) is based on EVOH, and the outer layer (5) is based on a mixture of (A) polyamide 6 and (B) at least one other polyamide selected from the following group: polyamide 612, polyamide 614, polyamide 616 and polyamide 618.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EMS-PATENT AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Caviezel, Heinz Masein, CH 6 58
Stöppelmann, Georg Bonaduz, CH 11 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00