Method of additively manufacturing an ophthalmic lens with at least one added function

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11772322
APP PUB NO 20200391434A1
SERIAL NO

16770848

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing an ophthalmic lens having at least one optical function includes: a step of additively manufacturing a complementary optical element by depositing a plurality of predetermined volume elements on a predetermined build support, the complementary optical element being configured to provide at least a part of the optical function of the ophthalmic lens, wherein the build support includes at least one added value or adhesive configured to provide to the ophthalmic lens at least one added function. An ophthalmic lens including a build support and a complementary optical element as well as an ophthalmic lens obtained by such a manufacturing method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ESSILOR INTERNATIONAL94220 CHARENTON-LE-PONT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feuillade, Mathieu Charenton-le-Pont, FR 28 102
Gourraud, Alexandre Charenton-le-Pont, FR 23 89
Padiou, Jean-Marc Charenton-le-Pont, FR 19 56
Quere, Loïc Charenton-le-Pont, FR 11 30
Roussel, Olivier Charenton-le-Pont, FR 19 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00